Speegle Construction has been awarded the contract for the Design-Build F-35A Armament Research Facility Addition (B614A) at Eglin Air Force Base, Florida by the U.S. Army Corps of Engineers – Mobile District in the amount of $8,007,900.
This project includes the demolition of existing 4,000SF of Building #T614 and the design and construction of a 2-story 10,143SF addition. The addition will provide office and administrative space, classroom/training space, storage areas to include mechanical, electrical and communication equipment rooms. The second floor will be a secure environment with controlled access. The new facility will comply with all the latest regulations and requirements. The facility will also feature sustainable design requirements (UFC 1-200-02) and fire protection requirements. Anti-terrorism and force protection requirements apply to this project. The scope of work includes new road work, applicable signage/hardscapes, landscaping, handicap accessible sidewalks, parking, stormwater management, and all utility infrastructure modifications/alterations needed. The project will be completed in 660 days.